Better Infrastructure

Current & Future Works

For further information please refer to our Gunnedah Shire Council Delivery Program 2013-2017 and Operational Plan 2016/17.

Simpson Bridge

Simpson bridge is situated approximately 2.9 kms from Breeza, on the Breeza-Carrol Road (Clifton Road) or 29.23 kms from Carrol, on the Breeza-Carrol Road (Clifton Road).Curre...

Urban Roads

Bloomfield StreetPreparing the heavy vehicle alternate route for a sustainable future, by enhancing the road pavement, and wearing surface to discard water whilst providing a...

Stormwater Upgrade

George Street from View to Westerweller Streets.

Major Water and Sewer Projects for 2016/17

The major Water and Sewer projects for 2016/17 include: Gunnedah Sewage Treatment Plant Upgrade. With an estimated cost of $8.1M the upgrade includes a new inlet and screening...

Better Infrastructure

Current & Future Works

For further information please refer to our Gunnedah Shire Council Delivery Program 2013-2017 and Operational Plan 2016/17.

Simpson Bridge

Simpson bridge is situated approximately 2.9 kms from Breeza, on the Breeza-Carrol Road (Clifton Road) or 29.23 kms from Carrol, on the Breeza-Carrol Road (Clifton Road).Curre...

Urban Roads

Bloomfield StreetPreparing the heavy vehicle alternate route for a sustainable future, by enhancing the road pavement, and wearing surface to discard water whilst providing a...

Stormwater Upgrade

George Street from View to Westerweller Streets.

Major Water and Sewer Projects for 2016/17

The major Water and Sewer projects for 2016/17 include: Gunnedah Sewage Treatment Plant Upgrade. With an estimated cost of $8.1M the upgrade includes a new inlet and screening...